IS WORK OVER?

Automation index

How much of a Mosaicist’s job can AI already do?

A cartoon comes earlier. Setting tesserae so the image reads do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mosaicist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Cartoon, cut and the colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set, joint and the one that goes off level.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Grout, clean and the sheen.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Floor, wall and the traffic.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the drawing and not changing halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it reads, and not leaving a trip.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tesserae
  • cartoon
  • grout
  • set mosaic
  • trip
  • walls
  • floors
  • cut the piece

Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7112

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 610Ski instructor19%
  2. 611Furniture assembler19%
  3. 612Plasterboard fitter19%
  4. 614Neurosurgeon19%
  5. 615Judicial police officer19%
  6. 616Power-plant operator19%