IS WORK OVER?

Automation index

How much of a Mosaicist’s job can AI already do?

A cartoon comes earlier. Setting tesserae so the image reads do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mosaicist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Cartoon, cut and the colour.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set, joint and the one that goes off level.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Grout, clean and the sheen.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Floor, wall and the traffic.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the drawing and not changing halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it reads, and not leaving a trip.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tesserae
  • cartoon
  • grout
  • set mosaic
  • trip
  • walls
  • floors
  • cut the piece

Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7112

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 512Ski instructor19%
  2. 513Furniture assembler19%
  3. 514Plasterboard fitter19%
  4. 516Neurosurgeon19%
  5. 517Power-plant operator19%
  6. 518Demolition worker19%