Automation index
How much of a Mosaicist’s job can AI already do?
A cartoon comes earlier. Setting tesserae so the image reads do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mosaicist
19%
AI can already do 19% of this job.
#515 / 633
View rankingMosaicist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cartoon, cut and the colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set, joint and the one that goes off level.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Grout, clean and the sheen.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Floor, wall and the traffic.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the drawing and not changing halfway.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it reads, and not leaving a trip.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tesserae
- cartoon
- grout
- set mosaic
- trip
- walls
- floors
- cut the piece
Sources for this job· O*NET 47-2044.00· ESCO/ISCO 7112
IS WORK OVER?
Wastewater-plant operator
19%
#519 / 633
View rankingWastewater-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, process and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Basin, the sludge and the one that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Breakdown, the pump and at night.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Test, the discharge and not hiding the spike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The rain, the overflow and not opening extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come out clean, and the sludge in place.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- works flow
- sludge
- basins
- pumps
- discharges
- overflows
- plant logs
- final tests
Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132