Automation index
How much of a Motion designer’s job can AI already do?
A template and an easing come earlier. Motion that tells, and does not nauseate, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Motion designer
25%
AI can already do 25% of this job.
#247 / 633
View rankingMotion designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Storyboard, easing and the brand template.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
After Effects, the render and the client who changes the end.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Rhythm, type and cutting to tempo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Delivery, formats and the one that is too heavy.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Art direction and not recycling the same whoosh.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it tells, and not nauseating with extra easing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- motion graphics
- easing
- motion storyboard
- type in motion
- renders
- cut to tempo
- brand templates
- delivery formats
Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142