IS WORK OVER?

Automation index

How much of a Mountain guide’s job can AI already do?

An avalanche report comes earlier. Taking the group and coming down whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mountain guide

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Report, route and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Walk, pace and the one who drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Ground, snow and the yes or no to go on.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Bivouac, the surprise and not improvising anchors.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the ego and not pushing the summit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and not trusting the report alone.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • avalanche reports
  • mountain routes
  • group pace
  • bivouac
  • anchors
  • ground
  • summit
  • mountain kit

Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 495Tennis coach19%
  2. 496Stucco artist19%
  3. 497Kayak guide19%
  4. 499Farrier19%
  5. 500Blacksmith19%
  6. 501Shutter installer19%