Automation index
How much of a Mountain guide’s job can AI already do?
An avalanche report comes earlier. Taking the group and coming down whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mountain guide
19%
AI can already do 19% of this job.
#498 / 633
View rankingMountain guide
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Report, route and the kit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Walk, pace and the one who drops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Ground, snow and the yes or no to go on.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Bivouac, the surprise and not improvising anchors.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the ego and not pushing the summit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and not trusting the report alone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- avalanche reports
- mountain routes
- group pace
- bivouac
- anchors
- ground
- summit
- mountain kit
Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113
IS WORK OVER?
Aerospace engineer
25%
#228 / 633
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144