Automation index
How much of a Mountain guide’s job can AI already do?
An avalanche report comes earlier. Taking the group and coming down whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mountain guide
19%
AI can already do 19% of this job.
#508 / 643
View rankingMountain guide
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Report, route and the kit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Walk, pace and the one who drops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Ground, snow and the yes or no to go on.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Bivouac, the surprise and not improvising anchors.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the ego and not pushing the summit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and not trusting the report alone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- avalanche reports
- mountain routes
- group pace
- bivouac
- anchors
- ground
- summit
- mountain kit
Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113
IS WORK OVER?
Chemical engineer
25%
#246 / 643
View rankingChemical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Balances, simulation and sizing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
P&IDs, specs and equipment lists.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Plant, operators and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Safety, HAZOP and discharges.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Quality, standards and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a process that will not explode.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Balances, simulation and sizing
- P&IDs, specs and equipment lists
- Plant, operators and commissioning
- Safety, HAZOP and discharges
- Quality, standards and documentation
- Sign a process that will not explode
- ingeniero quimico
- chemical engineer
Sources for this job· O*NET 17-2041.00· ESCO/ISCO 2145