IS WORK OVER?

Automation index

How much of a Mountain guide’s job can AI already do?

An avalanche report comes earlier. Taking the group and coming down whole do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Mountain guide

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Report, route and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Walk, pace and the one who drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Ground, snow and the yes or no to go on.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Bivouac, the surprise and not improvising anchors.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the ego and not pushing the summit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and not trusting the report alone.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • avalanche reports
  • mountain routes
  • group pace
  • bivouac
  • anchors
  • ground
  • summit
  • mountain kit

Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 505Tennis coach19%
  2. 506Stucco artist19%
  3. 507Kayak guide19%
  4. 509Farrier19%
  5. 510Blacksmith19%
  6. 511Shutter installer19%