Automation index
How much of a Mountain guide’s job can AI already do?
An avalanche report comes earlier. Taking the group and coming down whole do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Mountain guide
19%
AI can already do 19% of this job.
#603 / 753
View rankingMountain guide
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Report, route and the kit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Walk, pace and the one who drops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Ground, snow and the yes or no to go on.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Bivouac, the surprise and not improvising anchors.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the ego and not pushing the summit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and not trusting the report alone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- avalanche reports
- mountain routes
- group pace
- bivouac
- anchors
- ground
- summit
- mountain kit
Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113
IS WORK OVER?
Power engineer
22%
#401 / 753
View rankingPower engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Study, the short-circuit and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Substation, the disconnector and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Switching, the five rules and not skipping them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fault, the relay and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not blow, and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- short-circuits
- selectivity
- disconnectors
- five rules
- relays
- substations
- lockouts
- not work live
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151