Automation index
How much of a Museum educator’s job can AI already do?
A teaching sheet comes earlier. Thirty schoolchildren in front of the work, actually looking, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Museum educator
24%
AI can already do 24% of this job.
#303 / 753
View rankingMuseum educator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sheets, routes and the teaching kit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
The tour, the group that will not quiet, and the work.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Workshops, families and Sunday at the museum.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
School, bookings and the missing mediator.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Access, the public who do not come in, and adapting.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they actually look, and not reciting the label.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- school tours
- teaching sheets
- museum workshops
- cultural mediation
- group bookings
- access
- families at the museum
- learning routes
Sources for this job· O*NET 25-4012.00· ESCO/ISCO 2621
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165