Automation index
How much of a Music teacher’s job can AI already do?
A score comes earlier. Sounding together without hating the instrument do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Music teacher
22%
AI can already do 22% of this job.
#435 / 733
View rankingMusic teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Score, tuning and the term plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Class, the one out of tune and the one who does not practise.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rehearsal, the concert and the one who is ill.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Assess, auditions and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Families, the instrument and the one that will not fit at home.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sound together, and not hating the instrument.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- scores
- tune
- concert rehearsals
- auditions
- instrument lessons
- out of tune
- families
- term plan
Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2354
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142