IS WORK OVER?

Automation index

How much of a Musician’s job can AI already do?

A backing track and a score generate. Playing live, tuning to a room, and lasting a concert do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Musician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Compose, arrange and produce demos.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Scores, desk rehearsal and setlists.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Play in concert, session or pit.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Rehearse with the band and lock the live show.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Contracts, touring and promotion.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Lessons, commissions and keeping the instrument.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Compose, arrange and produce demos
  • Scores, desk rehearsal and setlists
  • Play in concert, session or pit
  • Contracts, touring and promotion
  • musico
  • musician
  • instrumentista
  • concertista

Sources for this job· O*NET 27-2042.00· ESCO/ISCO 2652

CAD designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimensions and the drawing.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Clash, the hit and not leaving it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
List, the material and the one that does not exist.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Change, the revision and not losing the native.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shop, the doubt and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be made, and not leaving the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • 3D models
  • dimensions
  • clashes
  • bills of materials
  • revisions
  • shop drawings
  • natives
  • hits

Sources for this job· O*NET 17-3013.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 521Train conductor21%
  2. 522Marine engineer21%
  3. 523Mediator21%
  4. 525Court officer21%
  5. 526Optician21%
  6. 527ENT doctor21%