IS WORK OVER?

Automation index

How much of a Musician’s job can AI already do?

A backing track and a score generate. Playing live, tuning to a room, and lasting a concert do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Musician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Compose, arrange and produce demos.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Scores, desk rehearsal and setlists.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Play in concert, session or pit.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Rehearse with the band and lock the live show.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Contracts, touring and promotion.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Lessons, commissions and keeping the instrument.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Compose, arrange and produce demos
  • Scores, desk rehearsal and setlists
  • Play in concert, session or pit
  • Contracts, touring and promotion
  • musico
  • musician
  • instrumentista
  • concertista

Sources for this job· O*NET 27-2042.00· ESCO/ISCO 2652

Drafter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimension and issue sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Quantities, legends and revisions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coordinate with architect, engineer and site.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drawing standards, stamps and issue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Archive, BIM and clashes.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not issuing a drawing nobody can read.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model, dimension and issue sheets
  • Quantities, legends and revisions
  • Drawing standards, stamps and issue
  • Archive, BIM and clashes
  • Not issuing a drawing nobody can read
  • delineante
  • proyectista
  • drafter
  • cad technician

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 435Train conductor21%
  2. 436Marine engineer21%
  3. 437Mediator21%
  4. 439Court officer21%
  5. 440Optician21%
  6. 441ENT doctor21%