IS WORK OVER?

Automation index

How much of a Nail technician’s job can AI already do?

A booking and a design come earlier. Nails that do not lift in two days do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nail technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bookings, charts and design catalogue.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Prep, apply gel and file.
Estimate

No public source provides a precise figure. This is our estimate.

24%10%+2.4
Hygiene, files and lamp.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Advise on shape, colour and aftercare.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Remove, repair and damaged nails.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Not leaving an infection or a lift.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bookings, charts and design catalogue
  • Prep, apply gel and file
  • Hygiene, files and lamp
  • Advise on shape, colour and aftercare
  • Remove, repair and damaged nails
  • Not leaving an infection or a lift
  • tecnico de uñas
  • manicurista
  • nail technician

Sources for this job· O*NET 39-5092.00· ESCO/ISCO 5142

Excavator operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, levels and the machine log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Dig, load and the batter that comes in.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Services, the blind pipe and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Maintenance, grease and the pin that snaps.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The labourer, the lorry and covering nobody.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Not breaking what is buried, and leaving a clean formation.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dig with excavator
  • load lorries
  • batters
  • buried services
  • set-out levels
  • grease the machine
  • formation
  • site GPS

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 8342

Analyse my job

Jobs with similar scores

  1. 590Taxi driver18%
  2. 591Lighting technician18%
  3. 592Sound technician18%
  4. 594Veterinary technician18%
  5. 595Actor17%
  6. 596Kitchen porter17%