Automation index
How much of a Nail technician’s job can AI already do?
A booking and a design come earlier. Nails that do not lift in two days do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nail technician
18%
AI can already do 18% of this job.
#713 / 763
View rankingNail technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bookings, charts and design catalogue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Prep, apply gel and file.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Hygiene, files and lamp.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Advise on shape, colour and aftercare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Remove, repair and damaged nails.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Not leaving an infection or a lift.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Bookings, charts and design catalogue
- Prep, apply gel and file
- Hygiene, files and lamp
- Advise on shape, colour and aftercare
- Remove, repair and damaged nails
- Not leaving an infection or a lift
- tecnico de uñas
- manicurista
- nail technician
Sources for this job· O*NET 39-5092.00· ESCO/ISCO 5142
IS WORK OVER?
Geomatics engineer
22%
#412 / 763
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165