IS WORK OVER?

Automation index

How much of a Nail technician’s job can AI already do?

A booking and a design come earlier. Nails that do not lift in two days do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nail technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bookings, charts and design catalogue.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Prep, apply gel and file.
Estimate

No public source provides a precise figure. This is our estimate.

24%10%+2.4
Hygiene, files and lamp.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Advise on shape, colour and aftercare.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Remove, repair and damaged nails.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Not leaving an infection or a lift.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bookings, charts and design catalogue
  • Prep, apply gel and file
  • Hygiene, files and lamp
  • Advise on shape, colour and aftercare
  • Remove, repair and damaged nails
  • Not leaving an infection or a lift
  • tecnico de uñas
  • manicurista
  • nail technician

Sources for this job· O*NET 39-5092.00· ESCO/ISCO 5142

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 590Taxi driver18%
  2. 591Lighting technician18%
  3. 592Sound technician18%
  4. 594Veterinary technician18%
  5. 595Actor17%
  6. 596Kitchen porter17%