Automation index
How much of a Nail technician’s job can AI already do?
A booking and a design come earlier. Nails that do not lift in two days do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nail technician
18%
AI can already do 18% of this job.
#703 / 753
View rankingNail technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bookings, charts and design catalogue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Prep, apply gel and file.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Hygiene, files and lamp.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Advise on shape, colour and aftercare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Remove, repair and damaged nails.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Not leaving an infection or a lift.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Bookings, charts and design catalogue
- Prep, apply gel and file
- Hygiene, files and lamp
- Advise on shape, colour and aftercare
- Remove, repair and damaged nails
- Not leaving an infection or a lift
- tecnico de uñas
- manicurista
- nail technician
Sources for this job· O*NET 39-5092.00· ESCO/ISCO 5142
IS WORK OVER?
Site engineer
19%
#606 / 753
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142