Automation index
How much of a Nail technician’s job can AI already do?
A booking and a design come earlier. Nails that do not lift in two days do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nail technician
18%
AI can already do 18% of this job.
#713 / 763
View rankingNail technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bookings, charts and design catalogue.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Prep, apply gel and file.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Hygiene, files and lamp.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Advise on shape, colour and aftercare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Remove, repair and damaged nails.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Not leaving an infection or a lift.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Bookings, charts and design catalogue
- Prep, apply gel and file
- Hygiene, files and lamp
- Advise on shape, colour and aftercare
- Remove, repair and damaged nails
- Not leaving an infection or a lift
- tecnico de uñas
- manicurista
- nail technician
Sources for this job· O*NET 39-5092.00· ESCO/ISCO 5142
IS WORK OVER?
Substation technician
19%
#670 / 763
View rankingSubstation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Switching, the sheet and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bay, the earth and not going in without it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Oil, the analysis and the one that bites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fault, the disconnector and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Control and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Open the right one, and not going in unearthed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switching
- substation sheets
- earths
- bays
- oil
- lockouts
- disconnectors
- not go in unearthed
Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113