Automation index
How much of a Nature guide’s job can AI already do?
A species card comes earlier. Actually looking without leaving litter do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nature guide
22%
AI can already do 22% of this job.
#337 / 633
View rankingNature guide
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, species and the group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the one who will not quiet and the one who lags.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Weather, the path and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Interpret, not reciting and the one who asks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, the nest and not getting too close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they look, and not leaving litter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- nature routes
- species
- interpret
- nests
- capacity
- paths
- field groups
- litter
Sources for this job· O*NET 39-7012.00· ESCO/ISCO 5113
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142