Automation index
How much of a Nature guide’s job can AI already do?
A species card comes earlier. Actually looking without leaving litter do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nature guide
22%
AI can already do 22% of this job.
#337 / 633
View rankingNature guide
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Route, species and the group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the one who will not quiet and the one who lags.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Weather, the path and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Interpret, not reciting and the one who asks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, the nest and not getting too close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they look, and not leaving litter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- nature routes
- species
- interpret
- nests
- capacity
- paths
- field groups
- litter
Sources for this job· O*NET 39-7012.00· ESCO/ISCO 5113
IS WORK OVER?
Train conductor
21%
#426 / 633
View rankingTrain conductor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Consist, brakes and the departure sheet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Platform, close-up and the one left outside.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Incidents, Control and the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Ticket staff, the fare dodger and the clash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The line, the points and not leaving early.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Leave nobody behind, and sign the consist.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- train consist
- platform close-up
- departure sheet
- Control
- brake check
- line incidents
- halts
- delays
Sources for this job· O*NET 53-4031.00· ESCO/ISCO 8312