IS WORK OVER?

Automation index

How much of a Naval architect’s job can AI already do?

A stability calc comes earlier. A ship that floats and does not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Backend developer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Endpoint, the contract and the test.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Spike, the queue and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Key, the secret and not leaving it in the repo.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Migration, the rollback and not improvising in prod.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Product, the deadline and not cutting the one that matters.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes the spike, and not leaving the key.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • endpoints
  • API contracts
  • queues
  • secrets
  • migrations
  • rollback
  • backend tests
  • write server code

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Analyse my job

Jobs with similar scores

  1. 283Electronics engineer25%
  2. 284Geological engineer25%
  3. 285Mechanical engineer25%
  4. 287Chemical engineer25%
  5. 288Interior designer25%
  6. 289Brewer25%