IS WORK OVER?

Automation index

How much of a Naval architect’s job can AI already do?

A stability calc comes earlier. A ship that floats and does not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Boiler technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, fault codes and spares.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Routes, appointments and permits.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Diagnose, open and repair the boiler.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Tune-up, combustion and pressures.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Clients, porters and plant-room access.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Gas, safety and not leaving the building cold.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Logs, fault codes and spares
  • Routes, appointments and permits
  • Diagnose, open and repair the boiler
  • Tune-up, combustion and pressures
  • Clients, porters and plant-room access
  • calderas
  • tecnico de calderas
  • calefaccion central

Sources for this job· O*NET 49-9021.00· ESCO/ISCO 7126

Analyse my job

Jobs with similar scores

  1. 237Electronics engineer25%
  2. 238Geological engineer25%
  3. 239Mechanical engineer25%
  4. 241Chemical engineer25%
  5. 242Interior designer25%
  6. 243Brewer25%