IS WORK OVER?

Automation index

How much of a Naval architect’s job can AI already do?

A stability calc comes earlier. A ship that floats and does not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Clinical research associate

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocol, CRF and the monitoring visit.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Source, the gap and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Adverse event, the deadline and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Consent, the signature and the one who did not understand.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The sponsor, the audit and not dressing the figure.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Audit, and not leaving a made-up figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CRF
  • monitoring
  • adverse events
  • informed consent
  • source data
  • trial audits
  • clinical protocols
  • site visits

Sources for this job· O*NET 11-9121.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 242Electronics engineer25%
  2. 243Geological engineer25%
  3. 244Mechanical engineer25%
  4. 246Chemical engineer25%
  5. 247Interior designer25%
  6. 248Brewer25%