IS WORK OVER?

Automation index

How much of a Naval architect’s job can AI already do?

A stability calc comes earlier. A ship that floats and does not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Headteacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Timetable, quotas and the staff.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Family, the complaint and the one that reaches inspection.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Behaviour, the sanction and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Budget, the club and not leaving a hole.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Inspection, the figure and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That Monday holds, and not hiding the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • school timetables
  • quotas
  • behaviour
  • sanctions
  • school budget
  • inspection
  • family complaints
  • senior staff

Sources for this job· O*NET 11-9032.00· ESCO/ISCO 1345

Analyse my job

Jobs with similar scores

  1. 247Electronics engineer25%
  2. 248Geological engineer25%
  3. 249Mechanical engineer25%
  4. 251Chemical engineer25%
  5. 252Interior designer25%
  6. 253Brewer25%