IS WORK OVER?

Automation index

How much of a Naval architect’s job can AI already do?

A stability calc comes earlier. A ship that floats and does not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Metrology technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, CMM and the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Measure, the stylus and the one that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, GD&T and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Room, the temperature and the soak.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The shop, the rush and not leaving the part dirty.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
A true dimension, and a clean report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • CMM
  • GD&T
  • stylus
  • measurement programs
  • metrology room
  • dimensions
  • dimensional reports
  • soak

Sources for this job· O*NET 17-3028.00· ESCO/ISCO 3111

Analyse my job

Jobs with similar scores

  1. 242Electronics engineer25%
  2. 243Geological engineer25%
  3. 244Mechanical engineer25%
  4. 246Chemical engineer25%
  5. 247Interior designer25%
  6. 248Brewer25%