IS WORK OVER?

Automation index

How much of a Naval architect’s job can AI already do?

A stability calc comes earlier. A ship that floats and does not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Pharmacovigilance officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Case, the file and MedDRA.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Seriousness, the link and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
File, the AEMPS deadline and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Signal, the aggregate and not playing it down.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The doctor, the ADR and not arguing the story.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
If it is serious, call it. And not staying quiet.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ADR
  • MedDRA
  • AEMPS
  • safety signals
  • seriousness
  • causality
  • case files
  • regulatory deadlines

Sources for this job· O*NET 29-1051.00· ESCO/ISCO 2262

Analyse my job

Jobs with similar scores

  1. 242Electronics engineer25%
  2. 243Geological engineer25%
  3. 244Mechanical engineer25%
  4. 246Chemical engineer25%
  5. 247Interior designer25%
  6. 248Brewer25%