IS WORK OVER?

Automation index

How much of a Naval architect’s job can AI already do?

A stability calc comes earlier. A ship that floats and does not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Residential porter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Shift, the sheet and the letterboxes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hall, the neighbour and the one who is not.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fault, the water and calling it in.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Move, the lift and not scratching.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The residents, the complaint and not taking sides.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Be there when it floods, and not losing the master.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fault sheets
  • master key
  • the hall
  • letterboxes
  • floods
  • moves
  • the residents
  • not take sides

Sources for this job· O*NET 39-6012.00· ESCO/ISCO 9629

Analyse my job

Jobs with similar scores

  1. 264Electronics engineer25%
  2. 265Geological engineer25%
  3. 266Mechanical engineer25%
  4. 268Chemical engineer25%
  5. 269Interior designer25%
  6. 270Brewer25%