IS WORK OVER?

Automation index

How much of a Naval architect’s job can AI already do?

A stability calc comes earlier. A ship that floats and does not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Route planner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Optimise, windows and capacity.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Restrictions, tolls and the right vehicle.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The salesperson who promises and the plan that will not.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Recalc, incidents and the next day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The warehouse, the cut-off and not leaving the last one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it fits, and not blowing the hours.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • optimise routes
  • delivery windows
  • tolls
  • vehicle capacity
  • recalc
  • traffic restrictions
  • warehouse cut-off
  • driving hours

Sources for this job· O*NET 13-1081.00· ESCO/ISCO 4323

Analyse my job

Jobs with similar scores

  1. 237Electronics engineer25%
  2. 238Geological engineer25%
  3. 239Mechanical engineer25%
  4. 241Chemical engineer25%
  5. 242Interior designer25%
  6. 243Brewer25%