IS WORK OVER?

Automation index

How much of a Naval architect’s job can AI already do?

A stability calc comes earlier. A ship that floats and does not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Station master

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Graph, orders and the station log.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Platforms, the crossing and the late train.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Staff, shifts and the ticket-office gap.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Incident, passengers and the PA.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Works, closures and leaving nobody on the platform.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they do not meet, and signing the graph.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • train graph
  • orders
  • platforms
  • ticket office
  • PA
  • line crossings
  • station shifts
  • station logs

Sources for this job· O*NET 53-4031.00· ESCO/ISCO 4323

Analyse my job

Jobs with similar scores

  1. 237Electronics engineer25%
  2. 238Geological engineer25%
  3. 239Mechanical engineer25%
  4. 241Chemical engineer25%
  5. 242Interior designer25%
  6. 243Brewer25%