IS WORK OVER?

Automation index

How much of a Naval architect’s job can AI already do?

A stability calc comes earlier. A ship that floats and does not break does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 237Electronics engineer25%
  2. 238Geological engineer25%
  3. 239Mechanical engineer25%
  4. 241Chemical engineer25%
  5. 242Interior designer25%
  6. 243Brewer25%