IS WORK OVER?

Automation index

How much of a NDT technician’s job can AI already do?

An NDT procedure comes earlier. Seeing the defect without signing it sound do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

NDT technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Procedure, technique and the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Test, the indication and the one that hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, the size and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, the scaffold and the access.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The welder, the rush and not signing it sound.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
See the defect, and a true report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • NDT
  • ultrasound
  • indications
  • procedures
  • scaffold
  • test reports
  • defect size
  • access

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 470PCB technician22%
  2. 471Dietetic technician22%
  3. 472Appliance technician22%
  4. 474Pharmacy technician22%
  5. 475Fibre technician22%
  6. 476Maintenance technician22%