Automation index
How much of a Nephrologist’s job can AI already do?
A filtration figure and a dose tweak come earlier. Calling dialysis and the vascular access do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nephrologist
23%
AI can already do 23% of this job.
#346 / 753
View rankingNephrologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read labs, clearance and the sediment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Kidney clinic, blood pressure and adherence.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Dialysis prescription, immunosuppression and anaemia.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Place or watch catheters and the vascular access.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Ward, consult and the patient who crashes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Transplant list and owning the filtration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- treat kidneys
- prescribe dialysis
- read clearance
- nephrology clinic
- vascular access
- immunosuppression
- renal hypertension
- transplant list
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165