Automation index
How much of a Nephrologist’s job can AI already do?
A filtration figure and a dose tweak come earlier. Calling dialysis and the vascular access do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nephrologist
23%
AI can already do 23% of this job.
#343 / 743
View rankingNephrologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read labs, clearance and the sediment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Kidney clinic, blood pressure and adherence.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Dialysis prescription, immunosuppression and anaemia.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Place or watch catheters and the vascular access.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Ward, consult and the patient who crashes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Transplant list and owning the filtration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- treat kidneys
- prescribe dialysis
- read clearance
- nephrology clinic
- vascular access
- immunosuppression
- renal hypertension
- transplant list
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142