IS WORK OVER?

Automation index

How much of a Network technician’s job can AI already do?

A diagram and a rack checklist come earlier. Pulling cable through a ceiling, and bringing a link up, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Network technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, inventory and standard configs.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Tickets, remote diagnosis and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Pulling, racking, crimping and labelling.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Bring up links, VLANs and site Wi-Fi.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
On-call, outages and user care.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Vendors, civil work and access.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Diagrams, inventory and standard configs
  • Tickets, remote diagnosis and logs
  • Pulling, racking, crimping and labelling
  • Bring up links, VLANs and site Wi-Fi
  • On-call, outages and user care
  • Vendors, civil work and access
  • tecnico de redes
  • network technician
  • cableador
  • cisco

Sources for this job· O*NET 15-1241.00· ESCO/ISCO 3513

Perfusionist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Build the circuit, prime and the checklist.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Run the pump, gases and temperature.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Cardioplegia, haemofiltration and weaning.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
ECMO, emergencies and the oxygenator change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Logs, alarms and talk to the surgeon.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
No air in the line and owning the machine.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • run the pump
  • CPB
  • prime the circuit
  • cardioplegia
  • ECMO
  • wean off pump
  • oxygenator
  • perfusion

Sources for this job· O*NET 29-2099.00· ESCO/ISCO 3212

Analyse my job

Jobs with similar scores

  1. 436Art conservator21%
  2. 437Sommelier21%
  3. 438Taxidermist21%
  4. 440Orthopaedic surgeon21%
  5. 441Urologist21%
  6. 442Teaching assistant20%