IS WORK OVER?

Automation index

How much of a Network technician’s job can AI already do?

A diagram and a rack checklist come earlier. Pulling cable through a ceiling, and bringing a link up, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Network technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, inventory and standard configs.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Tickets, remote diagnosis and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Pulling, racking, crimping and labelling.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Bring up links, VLANs and site Wi-Fi.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
On-call, outages and user care.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Vendors, civil work and access.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Diagrams, inventory and standard configs
  • Tickets, remote diagnosis and logs
  • Pulling, racking, crimping and labelling
  • Bring up links, VLANs and site Wi-Fi
  • On-call, outages and user care
  • Vendors, civil work and access
  • tecnico de redes
  • network technician
  • cableador
  • cisco

Sources for this job· O*NET 15-1241.00· ESCO/ISCO 3513

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 445Art conservator21%
  2. 446Sommelier21%
  3. 447Taxidermist21%
  4. 449Orthopaedic surgeon21%
  5. 450Urologist21%
  6. 451Teaching assistant20%