IS WORK OVER?

Automation index

How much of a Network technician’s job can AI already do?

A diagram and a rack checklist come earlier. Pulling cable through a ceiling, and bringing a link up, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Network technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, inventory and standard configs.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Tickets, remote diagnosis and logs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Pulling, racking, crimping and labelling.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Bring up links, VLANs and site Wi-Fi.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
On-call, outages and user care.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Vendors, civil work and access.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Diagrams, inventory and standard configs
  • Tickets, remote diagnosis and logs
  • Pulling, racking, crimping and labelling
  • Bring up links, VLANs and site Wi-Fi
  • On-call, outages and user care
  • Vendors, civil work and access
  • tecnico de redes
  • network technician
  • cableador
  • cisco

Sources for this job· O*NET 15-1241.00· ESCO/ISCO 3513

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 531Art conservator21%
  2. 532Sommelier21%
  3. 533Taxidermist21%
  4. 535Orthopaedic surgeon21%
  5. 536Urologist21%
  6. 537Teaching assistant20%