Automation index
How much of a Neurologist’s job can AI already do?
An MRI report and a first differential come earlier. Examining, needling and saying ALS do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Neurologist
24%
AI can already do 24% of this job.
#274 / 633
View rankingNeurologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read MRIs, EEGs and a first differential.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Examination, cranial nerves and gait.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Long clinic, family and bad news.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Reports, prescriptions and consults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
On-call, stroke and ward rounds.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Meeting, team and owning the diagnosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Read MRIs, EEGs and a first differential
- Examination, cranial nerves and gait
- Long clinic, family and bad news
- Reports, prescriptions and consults
- On-call, stroke and ward rounds
- Meeting, team and owning the diagnosis
- neurologo
- neurologist
Sources for this job· O*NET 29-1217.00· ESCO/ISCO 2212
IS WORK OVER?
CNC machinist
24%
#275 / 633
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223