IS WORK OVER?

Automation index

How much of a Neurologist’s job can AI already do?

An MRI report and a first differential come earlier. Examining, needling and saying ALS do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Neurologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read MRIs, EEGs and a first differential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Examination, cranial nerves and gait.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Long clinic, family and bad news.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Reports, prescriptions and consults.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
On-call, stroke and ward rounds.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Meeting, team and owning the diagnosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Read MRIs, EEGs and a first differential
  • Examination, cranial nerves and gait
  • Long clinic, family and bad news
  • Reports, prescriptions and consults
  • On-call, stroke and ward rounds
  • Meeting, team and owning the diagnosis
  • neurologo
  • neurologist

Sources for this job· O*NET 29-1217.00· ESCO/ISCO 2212

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 310Jeweller24%
  2. 311Intercultural mediator24%
  3. 312Internist24%
  4. 314CNC machinist24%
  5. 315Factory operator24%
  6. 316Landscape architect24%