IS WORK OVER?

Automation index

How much of a Neurologist’s job can AI already do?

An MRI report and a first differential come earlier. Examining, needling and saying ALS do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Neurologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read MRIs, EEGs and a first differential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Examination, cranial nerves and gait.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Long clinic, family and bad news.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Reports, prescriptions and consults.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
On-call, stroke and ward rounds.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Meeting, team and owning the diagnosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Read MRIs, EEGs and a first differential
  • Examination, cranial nerves and gait
  • Long clinic, family and bad news
  • Reports, prescriptions and consults
  • On-call, stroke and ward rounds
  • Meeting, team and owning the diagnosis
  • neurologo
  • neurologist

Sources for this job· O*NET 29-1217.00· ESCO/ISCO 2212

Naval architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Stability, strength and hull forms.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, specs and class rules.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, sea trials and owner.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Systems, machinery and onboard safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Rules, IMO and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a hull that will not break.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Stability, strength and hull forms
  • Drawings, specs and class rules
  • Yard, sea trials and owner
  • Systems, machinery and onboard safety
  • Rules, IMO and documentation
  • Sign a hull that will not break
  • ingeniero naval

Sources for this job· O*NET 17-2121.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 271Jeweller24%
  2. 272Intercultural mediator24%
  3. 273Internist24%
  4. 275CNC machinist24%
  5. 276Factory operator24%
  6. 277Landscape architect24%