IS WORK OVER?

Automation index

How much of a Neurologist’s job can AI already do?

An MRI report and a first differential come earlier. Examining, needling and saying ALS do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Neurologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read MRIs, EEGs and a first differential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Examination, cranial nerves and gait.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Long clinic, family and bad news.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Reports, prescriptions and consults.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
On-call, stroke and ward rounds.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Meeting, team and owning the diagnosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Read MRIs, EEGs and a first differential
  • Examination, cranial nerves and gait
  • Long clinic, family and bad news
  • Reports, prescriptions and consults
  • On-call, stroke and ward rounds
  • Meeting, team and owning the diagnosis
  • neurologo
  • neurologist

Sources for this job· O*NET 29-1217.00· ESCO/ISCO 2212

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 305Jeweller24%
  2. 306Intercultural mediator24%
  3. 307Internist24%
  4. 309CNC machinist24%
  5. 310Factory operator24%
  6. 311Landscape architect24%