IS WORK OVER?

Automation index

How much of a Neurologist’s job can AI already do?

An MRI report and a first differential come earlier. Examining, needling and saying ALS do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Neurologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read MRIs, EEGs and a first differential.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Examination, cranial nerves and gait.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Long clinic, family and bad news.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Reports, prescriptions and consults.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
On-call, stroke and ward rounds.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Meeting, team and owning the diagnosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Read MRIs, EEGs and a first differential
  • Examination, cranial nerves and gait
  • Long clinic, family and bad news
  • Reports, prescriptions and consults
  • On-call, stroke and ward rounds
  • Meeting, team and owning the diagnosis
  • neurologo
  • neurologist

Sources for this job· O*NET 29-1217.00· ESCO/ISCO 2212

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 310Jeweller24%
  2. 311Intercultural mediator24%
  3. 312Internist24%
  4. 314CNC machinist24%
  5. 315Factory operator24%
  6. 316Landscape architect24%