IS WORK OVER?

Automation index

How much of a Neurosurgeon’s job can AI already do?

Neuronavigation comes earlier. Going into the skull and not leaving a deficit do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Neurosurgeon

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Indicate, consent and the plan with neurology.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Craniotomy, spine and the tumour that bleeds.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Neuronavigation, monitoring and the margin.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Neuro ICU, pupils and raised pressure.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Family, the deficit and rehab.
Estimate

No public source provides a precise figure. This is our estimate.

14%28%+3.9
On-call, the haematoma and signing go or no-go.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • craniotomy
  • spine surgery
  • neuronavigation
  • brain tumour
  • neuro ICU
  • subdural haematoma
  • intraoperative monitoring
  • raised ICP

Sources for this job· O*NET 29-1241.00· ESCO/ISCO 2212

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 523Furniture assembler19%
  2. 524Plasterboard fitter19%
  3. 525Mosaicist19%
  4. 527Power-plant operator19%
  5. 528Demolition worker19%
  6. 529Wastewater-plant operator19%