Automation index
How much of a NGO programme officer’s job can AI already do?
A report and an indicator come earlier. The project existing outside the slide deck do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
NGO programme officer
26%
AI can already do 26% of this job.
#213 / 623
View rankingNGO programme officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design, indicators and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Justify, invoices and the donor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Field or neighbourhood and what does not fit the frame.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Partners, meetings and coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The surprise, the cut and redoing the timetable.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it works, and not inflating the indicator.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design projects
- justify to donors
- indicators
- activity report
- coordinate partners
- timetable
- project invoices
- neighbourhood work
Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142