IS WORK OVER?

Automation index

How much of a NGO programme officer’s job can AI already do?

A report and an indicator come earlier. The project existing outside the slide deck do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

NGO programme officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design, indicators and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Justify, invoices and the donor.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Field or neighbourhood and what does not fit the frame.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Partners, meetings and coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The surprise, the cut and redoing the timetable.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it works, and not inflating the indicator.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design projects
  • justify to donors
  • indicators
  • activity report
  • coordinate partners
  • timetable
  • project invoices
  • neighbourhood work

Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Analyse my job

Jobs with similar scores

  1. 210Copywriter26%
  2. 211Last-mile manager26%
  3. 212Development cooperation officer26%
  4. 214Lathe operator26%
  5. 215Archivist25%
  6. 216Boilermaker25%