Automation index
How much of a NGO programme officer’s job can AI already do?
A report and an indicator come earlier. The project existing outside the slide deck do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
NGO programme officer
26%
AI can already do 26% of this job.
#213 / 623
View rankingNGO programme officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design, indicators and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Justify, invoices and the donor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Field or neighbourhood and what does not fit the frame.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Partners, meetings and coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The surprise, the cut and redoing the timetable.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it works, and not inflating the indicator.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design projects
- justify to donors
- indicators
- activity report
- coordinate partners
- timetable
- project invoices
- neighbourhood work
Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635
IS WORK OVER?
Mining engineer
22%
#341 / 623
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146