IS WORK OVER?

Automation index

How much of a Non-commissioned officer’s job can AI already do?

A drill sheet comes earlier. The troops knowing the trade without humiliating them do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Non-commissioned officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drill, the trade and the sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Barracks, the one who is late and the one who skives.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Guard, the weapon and not sleeping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, the mistake and not humiliating in public.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The officer, the order and not leaving the troops hanging.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they know the trade, and not humiliating.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drill
  • barracks
  • guards
  • weapons
  • sheets
  • the troops
  • not humiliate
  • the military trade

Sources for this job· O*NET 55-1017.00· ESCO/ISCO 0110

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 462Book restorer22%
  2. 463Ticket inspector22%
  3. 464Cider maker22%
  4. 466Heat-pump technician22%
  5. 467Water technician22%
  6. 468Avionics technician22%