Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#306 / 753
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115