IS WORK OVER?

Automation index

How much of a Nuclear engineer’s job can AI already do?

A core model comes earlier. Running the plant and not playing with reactivity do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Cadastre officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, the plot and the owner.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Field, the wall and what is not there.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Value, the valuation and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Objection, the neighbour and the boundary.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The council, the tax and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is the one it is, and not inflating the value.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plots
  • cadastre plans
  • owners
  • boundaries
  • valuation papers
  • property tax
  • objections
  • walls

Sources for this job· O*NET 13-2023.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 295Museum educator24%
  2. 296Electrician24%
  3. 297Nurse24%
  4. 299Health inspector24%
  5. 300Interpreter24%
  6. 301Warehouse supervisor24%