Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142