Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Cleaner
16%
#609 / 633
View rankingCleaner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, checklists and product orders.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 32% | +4.5 |
Scrubber-driers and dosing.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 22% | +2.6 |
Mop, vacuum, disinfect and restock.EstimateNo public source provides a precise figure. This is our estimate. | 26% | 10% | +2.6 |
Waste, linen and sensitive areas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Shifts, keys and dealing with users.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Surprises: vomit, works, a complaint.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, checklists and product orders
- Scrubber-driers and dosing
- Mop, vacuum, disinfect and restock
- Waste, linen and sensitive areas
- Shifts, keys and dealing with users
- Surprises: vomit, works, a complaint
- limpiador
- limpiadora
- personal de limpieza
- cleaner
Sources for this job· O*NET 37-2011.00· ESCO/ISCO 9112