IS WORK OVER?

Automation index

How much of a Nuclear engineer’s job can AI already do?

A core model comes earlier. Running the plant and not playing with reactivity do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Commercial diver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, tables and the day’s gas.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bottom, tool and the one who snags.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Comms, the tender and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Inspection, wet weld or cut.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Current, zero vis and not losing the buddy.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Come up whole, and not skipping decompression.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dive plan
  • decompression tables
  • wet weld
  • tender
  • zero vis
  • underwater cut
  • dive gas
  • the bottom

Sources for this job· O*NET 49-9092.00· ESCO/ISCO 7541

Analyse my job

Jobs with similar scores

  1. 264Museum educator24%
  2. 265Electrician24%
  3. 266Nurse24%
  4. 268Health inspector24%
  5. 269Interpreter24%
  6. 270Warehouse supervisor24%